September 10, 2018 Kym Graves

Blog – Selmon Extension Bridge Columns

These steel forms for installing the columns are being assembled on the west end of the project. There are 35 columns from the entrance ramp at the Gandy Bridge to the interchange just west of Dale Mabry Highway. Check back on social media next month to see the actual formation of the pier!

Print Friendly, PDF & Email